Intranet and Microsoft 365 Solutions

Business Application Development with Power Apps

Field inspections, equipment assignment, visitor registration, purchase requests, quality control, stock counts. We turn these processes into role-based applications built with Power Apps that run on mobile and desktop. The data model, delegation limits and licensing impact are calculated at the start of the project.

Canvas AppsModel-driven AppsSharePoint ListsDataversePower FxDelegationOffline useLicensing analysis

Service definition

What is a Power Apps business application, and who is it for?

Power Apps is a low-code business application platform integrated with Microsoft 365. Canvas apps give freedom in screen design and run on phones, tablets and browsers. Model-driven apps generate forms and views from the Dataverse data model. When set up correctly, it connects the version chaos in Excel and forms circulating by email to a single authoritative data source. One source, one truth.

01

Does a Power Apps application work offline?

An offline scenario can be designed in a canvas app; synchronization rules and conflict handling are planned according to scope. Offline support is more mature with Dataverse.

02

How many users is it suitable for?

What matters more than the number of users is data volume, concurrent transactions and licensing cost. At high volumes, Dataverse or a custom application is considered.

03

Can our own team develop the application?

Yes. We can set up the architecture and standards, train your team, and provide code review and governance support.

04

Can it connect to existing SQL or ERP data?

Yes; but since SQL Server and most ERP connectors are premium, the licensing impact is calculated first. If needed, we recommend an API layer in between.

Project stages

How do we proceed?

01 / STAGE

Process analysis

Flows, data and roles are defined.

02 / STAGE

Prototype

The main screens are validated with users.

03 / STAGE

Development

The data model, screens and flows are completed.

04 / STAGE

Testing and pilot

Testing with real data volumes, feedback from pilot users.

STAGE 05

Go-live

Solution deployment, training and handover.

Corporate Web

Let’s move a process run on Excel and paper forms into a business application

We listen to the process, the number of users and the data sources. Then we present a proposal that sets out the data model, licensing impact and deliverables.